Nambiar Districtt 25
The latest update on Nambiar District 25 shows that the excavation and foundation work is in progress. Tower structural work has also begun. As of 20 August 2025, the Nambiar District 25 Phase 2 has officially launched with RERA No. PR/200825/008011, and is open for booking. Phase 1 of the project is almost sold out, with less than 50 units left.
Spread over 100 acres near Muthanallur Cross, off Sarjapur Road, this large township combines modern design with natural landscapes. 63 acres is reserved for residential development, which includes Phase 1, Phase 2, and future phases. More than 3,500 native trees will be planted within the project site. The township also has 80% open space and 40% green space.
The project is planned in multiple phases and will have about 4,000 thoughtfully designed apartments. Phase 1 has 796 units spread across six towers with 32 or 33 floors. Phase 2 has 816 units across 6 towers with 34 floors. Each tower has 4 lifts and only 4 units per floor, with every home designed as a corner unit for maximum privacy. All apartments are 2 BHK and above.
Live elevated at Nambiar District 25—110 acres of thoughtfully designed space with 6000+ luxury homes. Choose from 2, 2.5, 3, 3.5 & 4 BHK apartments ranging from 1200–2500 sq. ft. Possession is expected in 2028; RERA details coming soon.